How do we maximize our investment?

By: Sydney Covey

Apr 20, 2017

When a 501(c)3 nonprofit organization needed to assess a design-bid-build plan for a proposed relocation and modernization of its facility, STRUCTR delivered a thorough, unbiased review of the plan as well as insights to positively impact the project and reduce costs.

Beginning with a careful review of the proposed project’s design and pricing, we produced a white paper detailing the pros and cons as well as recommendations to balance first-costs with the design. Inexpensive design revisions to aid long-term operating costs were also highlighted.

Total savings for the new construction first-cost were $50,000 and the operating expense savings totaled approximately $30,000 over the life of the 5-year lease. After the organization’s building committee adopted the white paper in its entirety, and it was approved by the board, changes to the plan were implemented.

Today, the organization is in its new location and the savings were reinvested into additional software and equipment.

Back To Overview
Next Post →

Subscribe to our blog

recent posts

The Importance of Due Diligence in Real Estate Investments

Read More →

A Case Study- Stairwell Pressurization – Part II

Read More →

Greenbuild Conference: Protect Communities and their Environment

Read More →

Share This Post

Do you need assistance in maximizing your capital investments?

SOLUTIONS →